Mechanical OFCI Design Manager - Data Center Construction

Company shown to members 🔒 · Remote · US only

US only12+ years requiredPublished 26 October 2026Check carefully

Apply free: 3 jobs are on us✨ Tailor my resume for this job🎤 Practise the interview question, free

✓ Straight from the company's own careers page. No middlemen, no “we'll send you a check for equipment”. How we check jobs

✓ Sent 100 applications and heard nothing? Make this one count: tailor your resume to this ad in one tap, free.

✨ Not sure this is the one? Get your remote job matches in 30 seconds →

First recorded by Psst: 28 October 2026. Your first 3 jobs are free to apply to (the first right away, 2 more with your email). After that, the company and the apply link are for Psst members, from $4.99 for 7 days.

Free interview practice

Practise the first interview question for this job

If the company replies, the first call usually starts with a question like this. Vague answers are the easiest to reject. Write yours and get an AI score in under a minute.

The 20-second read

Experience
12+ years required
Where you can live
US only
Skills and tools
social media, project management, process improvement, compliance
Degree or licence
Mentioned (bachelor)
Job type
Full-time

Read from the ad by Psst's rules. Check the full ad below before applying.

Job details

Where you can work
United States
Employment type
Full-time
Advertised pay
Not stated by the employer
Experience
12+ years required
Employer publication date
26 October 2026
First recorded by Psst
28 October 2026
Last checked at the source
10 November 2026

About the job

The company are seeking an Mechanical OFCI Design Manager  to lead the design management and coordination of owner-furnished, contractor-installed (OFCI) mechanical equipment for a hyperscale data center campus. Reporting to senior program leadership, you will enforce technical standards, oversee long-lead procurement specifications for mechanical equipment such as chillers, CRAH/CRAC units, cooling distribution units (CDUs), air-cooled and dry coolers, pumps, and heat rejection systems, and ensure seamless integration between owner-supplied equipment and contractor scopes. You will guide design teams, review submittals, resolve interface risks, and align deliverables with schedule, cost, and commissioning requirements. The ideal candidate has multiple years of mission-critical mechanical design experience, a deep understanding of data center cooling architectures, and the leadership skills to drive multi-phase delivery in a fast-paced, high-growth environment.

Responsibilities

  • Strong leadership skills, experience leading a project management team, ensuring they deliver on all accountabilities.
  • Lead communications with the client and oversight of project management team services.
  • Lead research related to construction market conditions, including analysis of official published data.
  • Produce thought leadership reports providing valuable insights to the construction market
  • Lead the strategic and operational management of Project Management Services in a variety of sectors, including resource planning and management, financial management, business generation and training and development.
  • Set a clear strategy and ambition with the team in line with our Business Plan
  • Grow and develop exceptional people, promoting a culture of learning, respect and inclusivity.
  • Knowledge management – Ensure that key information and learning generated from each commission is inputted into internal databases and shared.
  • Process improvement – Identify and act upon ways to improve internal systems and processes.
  • Quality Control – Ensure compliance with quality standards and participation in ISO audits.
  • Develop priority plans including risk mitigation through internal tools, make performance measurements via Key Performance Indicators (KPI) and appraisal documents, management controls and critical success factors based on company goals
  • Undertake internal BMS audits, and coordinate and represent the office for external audits undertaken by the external certification authority.
  • Develop a detailed understanding of the market, acting as a brand ambassador and creating a pipeline of opportunity with existing and new clients
  • Identify and act upon cross-selling opportunities.
  • Participate in meetings with Senior leadership, Directors and staff and prepare and deliver presentations
  • Financial Management – Using internal software, track ongoing revenue, margin levels and monthly fees and resource requirements for each cost ,amahe commission.
  • Preparation of proposals/RFP responses for new clients/projects.
  • Attend relevant networking events and other promotional opportunities with directors.
  • Support the training and mentorship of current staff and promote an upward career trajectory.
  • Proactively partner with talent acquisition team to attract the best talent, actively manage resource requirements and proactively plan for future staffing needs.
  • Be a role model that drives a one business culture that achieves great outcomes by striking the right balance for our people, clients, stakeholders, and society.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
  • Bachelor’s degree in construction management, architecture, engineering or field related to construction.
  • Graduate degree in construction management, architecture, or engineering is preferred.
  • 12+ years of relevant construction project management experience.
  • 2+ years managing large high performing multi discipline teams in a consulting environment.
  • Proven track record of managing successful project management service delivery for clients.
  • Exceptional Business development ambition and acumen and demonstrated experience in achieving drive business growth.
  • Major construction sector experience working with high caliber clients in; commercial real estate, data center, life sciences, industrial manufacturing, natural resources, etc.
  • Demonstrates excellent presentation, verbal, written, organizational, and communication skills.

The salary range for this full-time role is  $170K-$210K  per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note the company reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.*

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

The company is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at  [link for members]

#LI-AP5

Join our social media conversations for more information about the company and our exciting future projects:

Twitter

Instagram

LinkedIn

It is strictly against the company policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with the company will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to the company personal e-mail accounts, are considered property of the company and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for the company, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

Join our social media conversations for more information about the company and our exciting future projects:

Twitter

Instagram

LinkedIn

It is strictly against the company policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with the company will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to the company personal e-mail accounts, are considered property of the company and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for the company, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

Who is the company?

All over the world people are using buildings, infrastructure, and assets we helped to deliver. It could be the hospital they work in, the railway they travel on every day, the fuel that powers their car or the data centre they depend on at work. For more than 75 years we’ve been helping to deliver transformational programmes across the real estate, infrastructure and natural resources sectors, making a difference to people’s lives and ensuring a return on investment for our clients and their investors.

Our purpose

Transforming performance for a green, inclusive, and productive world.

The world is changing and we have a responsibility to support that change, helping drive it and be part of it. Through the commitment, capability and care our team brings, we build trust between clients, suppliers, governments and society. Delivering better outcomes that have a positive impact on the world around us. We work smarter to face the challenges of the future; bringing the clarity that helps teams realise their full potential across the real estate, infrastructure and natural resources sectors. It’s how we’ve made the difference for more than 75 years.

Our values

Love a challenge:  We love a challenge and we work hard to make change happen and see things through. We don’t stand still, challenging ourselves and others to do better every day. And we are trusted to do the right thing, raising standards all the time.

Stronger together:  We’re stronger together by connecting people in diverse teams, so that we can all collaborate to deliver our best work. We focus on what matters and use our influence to build a better world for everyone.

Bring out the best in everyone:  We bring out the best in everyone. We help each other to make the most of our potential, always learning from our experience. We treat each other with care and respect and make time to give everyone a voice

Apply free: 3 jobs are on us✨ Tailor my resume for this jobPrepare with the Apply kit

Find my remote job matches →
Ghost Job Detector: Check carefully
  • Reposted
  • No pay listed
Signals, not proof. Check the company's page before you spend time on it.
Free to build · no sign-up

A resume that gets past the first 6 seconds

Recruiters skim. The Psst resume coach fixes what makes them skip you, line by line, and one tap tailors it to the exact job you're applying to.

  • 1Every line checkedWeak starts, clichés and AI-sounding phrases flagged, with a 3-question fix.
  • 2Tailored to the jobSee which skills and tools from the ad your resume is missing. Try it free on one of your matches.
  • 3Ready for remoteTime zone, tools and proof you work on your own, the things remote teams look for.
  • 4Looks the partOne page, 6 designs, 8 colours and a matching cover letter, free to build. Premium downloads the PDF and Word files.
Try the resume coach →Compare Premium

Set up your job alert