Controls Design Manager - Data Center Construction

Company shown to members 🔒 · Remote · US only

US only8+ years requiredPublished 14 October 2026Looks fresh

Apply free: 3 jobs are on us✨ Tailor my resume for this job🎤 Practise the interview question, free

✓ Straight from the company's own careers page. No middlemen, no “we'll send you a check for equipment”. How we check jobs

✓ Sent 100 applications and heard nothing? Make this one count: tailor your resume to this ad in one tap, free.

✨ Not sure this is the one? Get your remote job matches in 30 seconds →

First recorded by Psst: 15 October 2026. Your first 3 jobs are free to apply to (the first right away, 2 more with your email). After that, the company and the apply link are for Psst members, from $4.99 for 7 days.

Free interview practice

Practise the first interview question for this job

If the company replies, the first call usually starts with a question like this. Vague answers are the easiest to reject. Write yours and get an AI score in under a minute.

The 20-second read

Experience
8+ years required
Where you can live
US only
Skills and tools
social media, project management, stakeholder management, documentation, compliance
Degree or licence
Mentioned (bachelor's)
Job type
Full-time

Read from the ad by Psst's rules. Check the full ad below before applying.

Job details

Where you can work
United States
Employment type
Full-time
Advertised pay
Not stated by the employer
Experience
8+ years required
Employer publication date
14 October 2026
First recorded by Psst
15 October 2026
Last checked at the source
10 November 2026

About the job

The company is seeking a Controls Design Manager to work with our team and partner with our client, supporting design leadership for new and existing construction builds, with a focus on data center development.

The Controls Design Manager should have a strong background in building automation systems (BAS), industrial controls, SCADA, PLC-based systems, and data center critical infrastructure controls, with deep experience in controls design, engineering leadership, integration, and commissioning support.

Responsibilities

  • Provides support and reports to the assigned Project Manager(s) or Project Director. This position has frequent interaction with the Owner/Client, consultants, design professionals, systems integrators, and contractors.
  • Directly assist the Project Manager(s) in managing, coordinating, and administering the project through all phases of design and construction, with an emphasis on controls systems design, integration, and automation strategy.
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client's needs are addressed, including technical guidance on Building Management Systems (BMS), Electrical Power Monitoring Systems (EPMS), SCADA systems, and critical facility controls architecture.
  • Aids in the preparation of documents (reports, schedules, invoices, RFIs, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout, and client presentations) for programming, design, and construction, and will assist in maintaining information in project management software.
  • Coordinate and schedule meetings with the project team as directed by the Project Manager(s).
  • Communicate conceptual controls designs and create/maintain project documentation before, during, and after construction, including controls sequences of operation, controls design standards, points lists, network architecture drawings, and controls specifications.
  • Maintain Basis of Design (BOD), prototype controls designs, and template specifications for automation and controls systems, ensuring alignment with evolving business, operational, and reliability requirements.
  • Review and inform design RFPs, including scope development for controls engineering and systems integration services.
  • Manage external controls consultants, commissioning providers, and systems integrators through the design and construction process, ensuring controls contract documents are completed on schedule, within budget, and in accordance with company standards.
  • Effectively communicate controls standards and automation requirements to internal and external project partners, including engineering, operations, commissioning, and facilities teams.
  • Manage multiple fast-paced projects simultaneously, providing strategic technical leadership across controls system design, integration, and operational readiness activities.
  • Think outside the box to identify innovative controls solutions that improve operational efficiency, reliability, monitoring capabilities, and scalability while reducing lifecycle costs.
  • Support procurement activities through vendor submittal reviews, controls equipment evaluations, factory witness testing (FAT), and integrated systems testing planning.
  • Lead the review of controls sequences, alarms, trending strategies, system integrations, and monitoring requirements to ensure compliance with operational and reliability objectives.
  • Identify and implement innovative technologies that enhance automation, predictive monitoring, energy efficiency, fault detection, and system resilience.
  • Support commissioning and startup efforts, including controls functional performance testing, integrated systems testing (IST), and turnover documentation reviews.
  • Stay current with industry advancements and apply best practices related to controls systems, automation technologies, cybersecurity requirements, and data center operations.
  • Communicate and enforce engineering, controls, and design policies across the organization.
  • SOX control responsibilities may be part of this role and are to be adhered to where applicable.
  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, Controls Engineering, Automation Engineering, or related field.
  • 8+ years of experience in controls design, building automation, industrial automation, or mission-critical facilities.
  • Experience with Building Management Systems (BMS), Electrical Power Monitoring Systems (EPMS), SCADA, PLCs, and networked control systems.
  • Experience supporting hyperscale data center, mission-critical, or industrial facility projects.
  • Strong understanding of integrated systems testing, commissioning, and controls system operations.
  • Familiarity with control system cybersecurity requirements and industry standards.
  • Excellent communication, stakeholder management, and leadership skills.

The salary range for this full-time role is  $170K-$210K  per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note the company reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.*

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

The company is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at  [link for members]

#LI-AP5

Join our social media conversations for more information about the company and our exciting future projects:

Twitter

Instagram

LinkedIn

It is strictly against the company policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with the company will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to the company personal e-mail accounts, are considered property of the company and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for the company, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

Join our social media conversations for more information about the company and our exciting future projects:

Twitter

Instagram

LinkedIn

It is strictly against the company policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with the company will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to the company personal e-mail accounts, are considered property of the company and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for the company, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

Who is the company?

All over the world people are using buildings, infrastructure, and assets we helped to deliver. It could be the hospital they work in, the railway they travel on every day, the fuel that powers their car or the data centre they depend on at work. For more than 75 years we’ve been helping to deliver transformational programmes across the real estate, infrastructure and natural resources sectors, making a difference to people’s lives and ensuring a return on investment for our clients and their investors.

Our purpose

Transforming performance for a green, inclusive, and productive world.

The world is changing and we have a responsibility to support that change, helping drive it and be part of it. Through the commitment, capability and care our team brings, we build trust between clients, suppliers, governments and society. Delivering better outcomes that have a positive impact on the world around us. We work smarter to face the challenges of the future; bringing the clarity that helps teams realise their full potential across the real estate, infrastructure and natural resources sectors. It’s how we’ve made the difference for more than 75 years.

Our values

Love a challenge:  We love a challenge and we work hard to make change happen and see things through. We don’t stand still, challenging ourselves and others to do better every day. And we are trusted to do the right thing, raising standards all the time.

Stronger together:  We’re stronger together by connecting people in diverse teams, so that we can all collaborate to deliver our best work. We focus on what matters and use our influence to build a better world for everyone.

Bring out the best in everyone:  We bring out the best in everyone. We help each other to make the most of our potential, always learning from our experience. We treat each other with care and respect and make time to give everyone a voice

Apply free: 3 jobs are on us✨ Tailor my resume for this jobPrepare with the Apply kit

Find my remote job matches →
Ghost Job Detector: Looks fresh
  • No pay listed
Signals, not proof. Check the company's page before you spend time on it.
Free to build · no sign-up

A resume that gets past the first 6 seconds

Recruiters skim. The Psst resume coach fixes what makes them skip you, line by line, and one tap tailors it to the exact job you're applying to.

  • 1Every line checkedWeak starts, clichés and AI-sounding phrases flagged, with a 3-question fix.
  • 2Tailored to the jobSee which skills and tools from the ad your resume is missing. Try it free on one of your matches.
  • 3Ready for remoteTime zone, tools and proof you work on your own, the things remote teams look for.
  • 4Looks the partOne page, 6 designs, 8 colours and a matching cover letter, free to build. Premium downloads the PDF and Word files.
Try the resume coach →Compare Premium

Set up your job alert