Research Scientist - Construction Scheduling & Workforce Risk
AlphaX · Remote · US only
Apply on AlphaX's sitePrepare with the Apply kit
First recorded by Psst: 31 October 2026. Sign in with Google to continue to the employer. A free account is enough.
The 20-second read
- Experience
- Experience not stated
- Where you can live
- US only
- Skills and tools
- forecasting, scheduling
- Degree or licence
- Mentioned (phd)
- Job type
- Full-time
Read from the ad by Psst's rules. Check the full ad below before applying.
Job details
- Where you can work
- United States
- Employment type
- Full-time
- Advertised pay
- Not stated by the employer
- Experience
- Experience not stated
- Employer publication date
- 29 October 2026
- First recorded by Psst
- 31 October 2026
- Last checked at the source
- 31 October 2026
About the job
AlphaGov is seeking a Construction Research Scientist to support research and consulting opportunities involving construction schedules, workforce capacity, labor costs, and project delivery risk.
We are looking for someone who can evaluate how delays, competing projects, and limited skilled labor affect a project’s cost and completion date—and translate those findings into practical recommendations.
Scope of Work
- Analyze how project delays change workforce requirements, crew availability, and labor costs.
- Model resource constraints across multiple projects, including situations where crews remain on one project longer than planned.
- Develop and test scheduling, simulation, and forecasting methods using historical project data.
- Evaluate alternatives such as resequencing work, reallocating crews, overtime, and subcontracting.
- Define data requirements, validation methods, and measurable research objectives.
- Contribute technical methods, work plans, and findings to proposals and client deliverables.
Requirements
- PhD preferred in construction engineering, civil engineering, construction management, operations research, industrial engineering, or a related field. Comparable applied research experience will be considered.
- Experience with construction scheduling, resource allocation, project controls, or construction productivity research.
- Demonstrated experience with quantitative modeling, simulation, optimization, or statistical analysis.
- Familiarity with Primavera P6, critical path scheduling, resource-loaded schedules, or comparable methods.
- Ability to explain technical findings clearly to project leaders and nontechnical decision-makers.
Experience with electrical and mechanical construction, data centers, utilities, energy, or major infrastructure projects is especially relevant.
Benefits
Assignments are scoped individually, with compensation and time commitments agreed upon before work begins. Opportunities may include proposal development and delivery of awarded projects. Project delivery assignments depend on contract or funding awards and confirmed availability.
Applicants may opt into consideration for future AlphaGov proposals and consulting engagements. Applying does not guarantee an assignment. Any opportunity with a separate affiliated company would be discussed and confirmed separately.
To apply: Submit your résumé or CV highlighting relevant projects, research methods, publications, and your specific contribution.
- Reposted
- No pay listed
A resume that gets past the first 6 seconds
Recruiters skim. The Psst resume coach fixes what makes them skip you, line by line. Premium then shapes it for the exact job you're applying to.
- 1Every line checkedWeak starts, clichés and AI-sounding phrases flagged, with a 3-question fix.
- 2Tailored to the jobSee which skills and tools from the ad your resume is missing. Try it free on one of your matches.
- 3Ready for remoteTime zone, tools and proof you work on your own, the things remote teams look for.
- 4Looks the partOne page and an ATS-safe PDF, free. Premium adds 6 designs, 8 colours and a matching cover letter.
Example with made-up details. The score is the builder's own check, not an ATS rating or a promise of an interview.